An existing pipeline at a potash plant was at its maximum capacity.
To meet future production target, a set of crossties between existing pipelines & spare lines were required.
Acting as the owner’s engineer from basic engineering to execution, Arka
provided the following project engineering services:
Project Highlights
As these pipelines were located outside, the project only had a small window for construction. The existing lines had not been inspected
since being put in service 7 years prior, with the conditions unknown, adding risk to the construction schedule. These items were
highlighted in the execution scope of work, and thoroughly communicated with the bidders.