A client undertook the installation of an additional centrifuge in their existing plant.
They requested a mechanical engineer seconded from Arka to fulfill the role of Project Engineer. Contributions included:
This project was completed on time and on budget.
With careful discussion between stakeholders and the centrifuge vendor, the centrifuge was brought online months earlier than anticipated. This was done by utilizing a spare long lead time assembly that could be installed in the new centrifuge months before a new one could be delivered.