The client’s existing loading system generated excess fines which limited the loading rate capacity.
The solution was to construct a dedicated material handling circuit, storage building and truck loading facility to maximize loading capacity.
Arka acted as the owner’s engineer from early detailed engineering stage to execution, providing the following services:
The project experienced early challenges, having been affected by supply chain issues with equipment vendors, a change in 3rd party engineer, and changes in project personnel; however,